Press enter to begin your search

Multifamily Construction Defect Claims (Part 2)

In this 2 part blog post I wanted to touch on some basics of the typical “multifamily” construction defect case. Whether the project is a condominium, apartment, assisted living facility or hotel they share many of the same issues.  There are six primary considerations in bringing these claims but each of those has many subparts which depend on specific facts of the project.  Considerations 1 to 3 are here. The fourth consideration is the type of recovery available.  Generally the cost of repairing the defective condition is the damage that can be recovered.  In the event that such repair would be economically wasteful courts may consider diminution of value to be a valid damage.  In addition, depending on the type of property there may also be lost rents, lost profits claims for the time that the property was not able to be used for its intended purpose or for partial loss...

Multifamily Construction Defect Claims (Part 1)

In this 2 part blog post I wanted to touch on some basics of the typical “multifamily” construction defect case. Whether the project is a condominium, apartment, assisted living facility or hotel they share many of the same issues.  There are six primary considerations in bringing these claims but each of those has many subparts which depend on specific facts of the project. The first consideration is who is the true owner and is that entity able to recover for the defective construction.  Is there a condominium association or building owner? Maybe it is the hotel or facility operator that is the aggrieved party or is the developer of the building?  Knowing who has the rights to make the defect claims is a critical first step. The second consideration is to determine against whom any claims may be asserted.  Is there a claim against the developer of real property who designed, built...

2015 Chapter 558 Legislative changes

As previously noted, House Bill 87 modified some of the requirements of Chapter 558, Florida Statutes.  The statute was recently signed by Governor Rick Scott and the changes will take effect Oct. 1. The original intent of Chapter 558, enacted in 2003, was to require compliance with a mandatory pre-suit process before claims for construction defects could be brought in court.  Originally the claims subject to Chapter 558 were limited to residential defect claims but now include all residential and commercial project claims for defects.  All public projects are also included except for projects involving the Florida Department of Transportation.  In my experience the pre-suit process does not resolve many claims and add barriers and costs to owners and end-users.  A cynic might believe that the statute is working as intended. Chapter 558 requires written notice from the claimant to the construction or design professionals believed to be responsible for defects or...